
Hard FM
Hard FM covers the engineering and fabric of a building: heating and ventilation, power, water services, fire and life-safety support and the building fabric itself. Allied Force Group plans this work per tagged asset using SFG20-aligned task content, and records every closed job against the asset register.
Building services maintained on a PPM schedule built from the asset register, with reactive attendance when something falls outside tolerance. Task content is set against SFG20-aligned schedules where they apply to the asset, work is carried out under RAMS and permit-to-work, and statutory activity is coordinated with your own duty holders. Scope is confirmed following a site review.
Scope of hard fm
Mechanical and HVAC
- ✓Air handling, chiller and cooling plant servicing
- ✓Ventilation and filtration maintenance
- ✓Pump, valve and pipework attention
- ✓PPM task content aligned to SFG20 schedules where applicable
Electrical and plumbing
- ✓Electrical distribution inspection and testing support
- ✓Lighting, emergency lighting and small power works
- ✓Plumbing, drainage and sanitaryware repairs
- ✓Isolations and works controlled under permit-to-work
Fabric and life safety
- ✓Building fabric repairs and minor works
- ✓Doors, locks, ceilings and floor finishes
- ✓Fire and life-safety system support, coordinated with your responsible person
- ✓Planned and reactive maintenance recorded in CAFM, with logbooks and O&M records kept current
Hard FM questions
What is the difference between hard FM and soft services?
Hard FM covers the physical plant and fabric of a building — HVAC, electrical distribution, water services, lifts, fire systems and the structure. Soft services cover the people-facing side: cleaning, waste, hygiene, grounds and front of house.
How is planned maintenance scheduled?
Planned maintenance is scheduled per tagged asset rather than per visit, using SFG20-aligned task content where it applies, with a frequency and a statutory reference where one exists. The schedule sits in the CAFM system alongside the reactive record.
How are reactive repairs handled?
Reactive jobs are logged on the helpdesk with a priority, triaged, RAMS reviewed where the task requires it, attended and closed with evidence: timestamp, engineer identity, parts used and a photograph where the work is not otherwise visible.
What compliance records are produced?
Statutory and compliance tasks are tracked with logbook entries and O&M records, so the evidence behind a completion figure can be produced on request rather than assembled later.
Talk through hard fm for your estate.
Send your requirements through the enquiry form, or call 020 7183 9055 or email sales@alliedforcegroup.com.
